Remaining workload

I'll read it through the fire.

Ideal burner.: Demonstrate the desired progress of the project as planned.
Actual burn-out line (green): Shows the actual progress of the project. If the actual line is above the desired line, it means that it is behind; if it is below, it means that it is ahead of schedule.
Remaining workload (yellow): Shows the remaining story points at the end of the day.